Skip to main content
Western Electricity Coordinating Council
Go Search
Skip navigation links
Home
About WECC
Standards
Committees
Planning
Training
Library
Compliance
Careers
Western Electricity Coordinating Council > Library > RRO Documents

RRO Documents

Regional Reliability Organization documents related to NERC Reliability Standards.
Standard Name of Standard WECC Documents to Comply with Standard
BAL-002-0 Disturbance Control Performance WECC BAL-STD-002-0 (January 2007)
EOP-004-0 Disturbance Reporting NERC Revised Event Analysis Process
EOP-007-0 Documentation of Blackstart Generating Unit Test Results  EOP-007-WECC-CRT-1 Blackstart Capability and Blackstart Resource Testing Plan

MOD-011-0

Regional Steady-State Data Requirements and Reporting Procedures

Most Current Study Program Outline

Data Bank Compilation Schedule (PCC Handbook VI-2, January 2006)

MOD-013-0

RRO Dynamics Data Requirements and Reporting Procedures

WECC Data Preparation Procedural Manual For Power Flow and Stability Studies July 2010 REV. 7.1

Most Current Study Program Outline

1996 Disturbance Report Recommendations

1997 Letter implementing the Generator Test Policy

Test Guidelines for Synchronous Unit Dynamic Testing and Model Validation

Generating Unit Model Validation Policy

MOD-016-0

RRO documentation of auto reporting requirements for actual and forcast demands, net energy for load and controllable demand - side management 

 2010 Data Collection Manual

MOD-024-1 Verification of Generator Gross and Net Real Power Capability

WECC 2006 Generator Test Policy

Note: the WECC Generator Test Policy includes additional requirements over and above those of MOD-024 and MOD-025, but all Requirements of MOD-024 and MOD-025 are included in the Policy.

MOD-025-1 Verification of Reactive Power Capability

 WECC 2006 Generator Test Policy

1997 Letter and Testing Guidelines

Note: the WECC Generator Test Policy includes additional requirements over and above those of MOD-024 and MOD-025, but all Requirements of MOD-024 and MOD-025 are included in the Policy.

PRC-002-0 Comprehensive requirements for the installation of disturbance monitoring equipment.

WECC Plan for Dynamic Performance and Disturbance Monitoring October 2004

 Plan for Dynamic Performance and Disturbance Monitoring - Attachment 1

Plan for Dynamic Performance and Disturbance Monitoring - Supplement

PRC-003-1 Each RRO shall establish, document and maintain its procedure for, review, analysis, reporting and mitigation of transmission and generation Protection System Misoperations.

PRC-004-WECC-1

PRC-003-WECC-CRT-1

 

PRC-006-0

Assuring Consistency with Regional UFLS Programs

 WECC Off-Nominal Frequency Load Shedding Plan December 16, 2010

PRC-012-0 Each RRO with an entity that uses or plans to use SPS shall have a documented RRO SPS review procedure.

PRC-012 through 014-WECC-CRT-1 Remedial Action Scheme Criterion