Skip to main content
Western Electricity Coordinating Council
Go Search
Skip navigation links
Home
About WECC
Standards
Committees
Planning
Training
Library
Compliance
Careers
Skip navigation links
Documents
Action Items
Calendar
Team Discussion
Economic Study Requests
Stimulus Bill Funding
External Document Library
Modify settings and columns
Action Items
  
View: 
Sort by AttachmentsUse SHIFT+ENTER to open the menu (new window).
Status TextFilter
1
PCC, TEPPC Coordinating Roles and Responsibilities Use SHIFT+ENTER to open the menu (new window).
(2) NormalActiveSWalton12/31/2010
Document posted for comment. comments due 12/14.
2
Report on Options for PortalUse SHIFT+ENTER to open the menu (new window).
(2) NormalActiveSWalton6/30/2010
Steve is following up with the SPSG's, still a few projects that have not been submitted. Brad working on the website.
3
Coordination of calendaring between all TEPPC groups Use SHIFT+ENTER to open the menu (new window).
(2) NormalActivebnickell@wecc.biz11/1/2010
Coordination of WECC events complete. Brad to follow-up on process to get SPG events on WECC calendar.
4
Develop options for measuring SPG participation.Use SHIFT+ENTER to open the menu (new window).
(2) NormalCompleteScott.Cauchois@comcast.net11/19/2009
Completed 11/19/09
5
Charter revision ad-hoc group.Use SHIFT+ENTER to open the menu (new window).
(2) NormalActivegrace_anderson@energy.state.ca.us12/4/2009
Interim version to be distributed to TEPPC by 12/4.
6
Develop New Draft Version of TEPPC ProtocolUse SHIFT+ENTER to open the menu (new window).
(2) NormalActiveSWalton12/31/2010
Interim draft will be posted for TEPPC comment by 12/3. Target adoption via TEPPC call in January 2010.
7
Protocol Revision Ad-Hoc Group to Review New Draft of TEPPC ProtocolUse SHIFT+ENTER to open the menu (new window).
(2) NormalActiveSWalton12/31/2010
Combined with TEPPC-sep-09-2.
8
Discuss Regional Transmission Planning Coordination with PCCUse SHIFT+ENTER to open the menu (new window).
(2) NormalActiverekondzi@srpnet.com12/31/2010
Task Force established.
9
Fill Vacancy in the TEPPC Environmental SlotUse SHIFT+ENTER to open the menu (new window).
(2) NormalActiveScott.Cauchois@comcast.net11/9/2009
Completed.
10
Annual vs. Biennial Cycle Impacts on 890 Compliance.Use SHIFT+ENTER to open the menu (new window).
(2) NormalActiverekondzi@srpnet.com12/31/2010
Change does not cause an issue with FERC staff, but TP's need to continue to have annual request process. Need to address how interim year requests are handeld.