| 2006-02 | Assess Transmission and Future Needs | Transmission Planner, Planning Coordinator | NERC BOT approved. Implementation pending regulatory filing. Filed with FERC 10/19/77. Docket No. RM06-16-000. |
| 2006-06 | Reliability Coordination | Transmission Operator, Balancing Authority, Generator Operator, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Transmission Service Provider, Purchasing-Selling Entity | IRO-002-3, IRO-005-4, IRO-014-02 are NERC BOT approved. Implementation pending regulatory filing and conforming changes to IRO-001-1.1.
Development on COM-001-2, COM-002-3, and IRO-001-3 continues. The LSE, PSE, TSP, and Interchange Coordinator were removed from the applicability list for these three standards. |
| 2007-01 | Underfrequency Load Shedding | Transmission Operator, Transmission Owner, Load-Serving Entity, Distribution Provider | NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 3/31/11 Docket No. RM06-16-000. NOPR issued 10/20/11 |
| 2007-02 | Operating Personnel Communications Protocols | Transmission Owner, Generator Operator, Interchange Authority | Considering comments from 11/30/09-1/15/10 Posting |
| 2007-03 | Real-time Operations | Transmission Operator, Transmission Owner, Generator Operator, Interchange Authority | Considering comments from 4/26/11-6/9/11 posting and ballot |
| 2007-04 | Certifying System Operators | Transmission Operator, Balancing Authority, Reliability Coordinator | FERC approval 9/15/11 Docket No. RD11-7-000. |
| 2007-06 | System Protection Coordination | Transmission Operator, Balancing Authority, Generator Operator | Considering comments from 9/11/09-10/26/09 posting |
| 2007-07 | Transmission Vegetation Management | Transmission Operator | Pending Regulatory Filing |
| 2007-09 | Generator Verification | Generator Owner, Generator Operator, Transmission Planner | Considering comments for MOD-026-1 and PRC-024-1 from 7/22/11-8/1/11 ballot.
Considering comments from the 6/15/11-7/15/11 comment period for the MOD-025-2, MOD-027-1, and PRC-019-1 standards. |
| 2007-11 | Disturbance Monitoring | Transmission Owner, Generator Owner | Considering comments from 2/2/09-3/18/09 posting |
| 2007-12 | Frequency Response | Balancing Authority, Generator Owner, Generator Operator, Load-Serving Entity, Reliability Coordinator | Posted for comment (10/25/11-12/09/11)
Ballot Period (11/30/11-12/09/11) |
| 2007-17 | Protection System Maintenance and Testing | Transmission Owner, Generator Owner, Distribution Provider | Considering the comments during the comment and ballot periods ending 9/28/11
The project will proceed to a successive ballot.
Definition filed with FERC 3/30/11 Docket No. RM11-19-000 |
| 2007-18 | Reliability-Based Control | Balancing Authority, Generator Operator, Load-Serving Entity, Reliability Coordinator, Purchasing-Selling Entity | Merged with Project 2007-05 into Project 2010-14
Standards Under Field Test |
| 2008-01 | Voltage and Reactive Control | Transmission Owner, Generator Owner, Generator Operator, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Transmission Planner, Resource Planner, Planning Coordinator, Purchasing-Selling Entity | NERC is drafting a draft standard. |
| 2008-02 | Undervoltage Load Shedding | Transmission Operator, Transmission Owner, Generator Owner, Generator Operator, Load-Serving Entity, Distribution Provider | Considering comments from SAR Posting (1/20/10-2/19/10) |
| 2008-06 | Cyber Security - Order 706 | Reliability Coordinator | Version 4 of the CIP Standards (Phase II) approved by NERC BOT 1/24/11. FERC issued NOPR for CIP V4 standards on 9/15/11 Docket No. RM11-11-000.
FERC Approval of VRFs and VSLs for CIP Versions 2 and 3 January 20, 2011.
Update from Version 1 to Version 2 (Phase I) approved by FERC. Enforceable April 1, 2010.
FERC approved Version 1 March 18, 2010.
Version 5 of CIP Standards
Initial ballot (12/16/11-1/06/12) Join ballot pool (11/07/11-12/15/11) Comment period (11/07/11-01/06/12)
|
| 2008-09 | Interpretation of EOP-001-0 R1 by Regional Entity Compliance Managers | Transmission Operator, Balancing Authority | FERC approval 12/15/11 Docket No. RD11-12-000
. |
| 2008-10 | Interpretation - CIP-006 - Cyber Security - Physical Security of Cyber Security Assets | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Reliability Coordinator, Transmission Service Provider | Recirculation ballot (12/09/11-12/19/11)
|
| 2008-12 | Coordinate Interchange Standards | Transmission Operator, Balancing Authority, Generator Operator, Interchange Authority, Load-Serving Entity, Reliability Coordinator, Transmission Service Provider, Purchasing-Selling Entity | Considering comments from 11/10/09-12/11/09 posting |
| 2009-01 | Disturbance and Sabotage Reporting | Transmission Operator, Balancing Authority, Generator Operator, Load-Serving Entity, Reliability Coordinator | Posted for comment (10/28/11-12/12/11) Ballot Period (12/02/11-12/12/11) |
| 2009-02 | Real-Time Reliability Monitoring and Analysis Capabilities | Transmission Operator, Balancing Authority, Generator Operator, Reliability Coordinator | Considering comments received during Concept White Paper posting of 2/16/11-4/4/11 |
| 2009-03 | Emergency Operations | Transmission Operator, Balancing Authority, Generator Operator, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Transmission Service Provider, Purchasing-Selling Entity | |
| 2009-05 | Resource Adequacy Assessments | Generator Owner, Generator Operator, Load-Serving Entity, Resource Planner, Planning Coordinator | The NERC Standards Coordinator is recommending for inclusion in the NERC Rules of Procedure. |
| 2009-06 | Facility Ratings | Transmission Owner, Generator Owner | NERC BOT approved. Filed with FERC 6/15/11 Docket No. RM11-28-000.
FERC approval 11/17/11 Docket No. RD11-10-000. |
| 2009-07 | Reliability of Protection Systems | Transmission Owner, Generator Owner, Distribution Provider | |
| 2009-10 | Interpretation of PRC-005-1 R1 by Compliance Monitoring Process Working Group (CMPWG) | Transmission Owner, Generator Operator, Distribution Provider | NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 11/17/09 Docket No. RM06-16-000. |
| 2009-20 | Interpretation of BAL-003-0 R4 and R5 by Energy Mark, Inc. | Balancing Authority | Requesting NERC BOT approval. |
| 2009-22 | Interpretation of COM-002-0 R2 by the ISO/RTO Council | Transmission Operator, Balancing Authority, Generator Operator, Reliability Coordinator | Considering comments from November ballot. |
| 2009-24 | Interpretation of EOP-005-1 R7 by FMPA | Transmission Operator, Balancing Authority | Balloting Deferred per NERC Standards Committee. |
| 2009-26 | Interpretation of CIP-004-1 by WECC | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Reliability Coordinator, Reliability Entity, Transmission Service Provider | |
| 2009-27 | Interpretation of TOP-002-2a R10 by FMPP | Transmission Operator, Balancing Authority, Generator Operator, Load-Serving Entity, Transmission Service Provider | FERC approved 10/20/11 Docket No. RD11-9-000.
|
| 2009-28 | Interpretation of EOP-001-1 and EOP-001-2 R2.2 by FMPP | Transmission Operator, Balancing Authority | NERC BOT approved.
FERC filing 9/9/11; Docket No. RM11-32-000 . |
| 2010-05.1 | Project 2010-05.1 Protection Systems: Phase 1 (Misoperations) | Transmission Owner, Generator Owner, Distribution Provider | Considering comments for SAR and draft standard from 6/10/11-7/11/11 posting. |
| 2010-07 | Transmission Requirements at the Generator Interface | Transmission Operator, Transmission Owner, Generator Owner, Generator Operator | Considering comments form 11/9/11-11/18/11 ballot |
| 2010-08 | Functional Model Glossary Revisions | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Transmission Planner, Resource Planner, Transmission Service Provider, Planning Coordinator, Purchasing-Selling Entity | |
| 2010-11 | TPL Table 1 Order | Transmission Planner, Planning Coordinator | NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 3/31/11 Docket No. RM06-16-009.
NOPR issued 10/20/11. |
| 2010-13.1 | Transmission Relay Loadability (Phase 1) | Transmission Owner, Generator Owner, Distribution Provider, Reliability Coordinator, Planning Coordinator | FERC approved Compliance Filing May 16, 2011 (Docket RD10-10-000)
PRC-023-2 Filed with FERC on March 18, 2011.
FERC NOPR issued 9/15/11 (Docket No. RM11-16-000)
|
| 2010-13.2 | Phase 2 of Relay Loadability: Generation | Transmission Owner, Generator Owner, Distribution Provider, Planning Coordinator | Project in Informal Development |
| 2010-14.1 | Balancing Authority Reliability-based Control: Reserves (Phase 1) | Balancing Authority | First draft is scheduled for December 2011. |
| 2010-14.2 | Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and Inadvertent | Balancing Authority | |
| 2010-16 | 2010-13 | Generator Operator | Considering comments submitted about the SAR that was posted from 11/3/10-12/3/10
|
| 2010-17 | Definition of Bulk Electric System | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Reliability Entity, Transmission Planner, Resource Planner, Transmission Service Provider, Planning Coordinator, Purchasing-Selling Entity, Reserve Sharing Group | BES Exception Process: considering comments from 9/13/11-10/27/11 posting
BES definition is waiting for NERC Board adoption. |
| 2010-INT-01 | Interpretation − TOP-006-2 by FMPP | Transmission Operator, Balancing Authority, Generator Operator, Reliability Coordinator | Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee. |
| 2010-INT-02 | Interpretation − TOP-003-1 by FMPP | Transmission Operator, Balancing Authority, Generator Operator, Reliability Coordinator | Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee. |
| 2010-INT-03 | Interpretation − TOP-002-2a by FMPP | Transmission Operator, Balancing Authority, Generator Operator, Load-Serving Entity, Transmission Service Provider | Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee. |
| 2010-INT-05 | CIP-002-1 Requirement R3 for Duke Energy | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Reliability Coordinator, Reliability Entity, Transmission Service Provider | Approved CIP-002-2. This interpretation is still under development. |
| 2011-INT-01 | Interpretation of MOD-028-1 for FPL | Transmission Operator, Transmission Service Provider | Considering comments form11/7/11-11/16/11 ballot |
| 2011-INT-02 | Interpretation of VAR-002 for Constellation | Generator Owner, Generator Operator | |
| 2012-2014 | Reliability Standards Development Plan | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Transmission Planner, Resource Planner, Transmission Service Provider, Planning Coordinator, Purchasing-Selling Entity, Reserve Sharing Group | Approval of the North American Electric Reliability Corporation’s Reliability Standards Development Plan 2012-2014 is pending regulatory filing.
|
| BAL-004-1 | Urgent Action SAR for Revision - BAL-004-1 | Balancing Authority, Reliability Coordinator | FERC remanded March 18, 2010
Docket No. RM09-16-000 |
| Errata | Errata -Various Standards Errata | Transmission Operator, Balancing Authority, Load-Serving Entity, Reliability Coordinator, Transmission Planner, Resource Planner, Transmission Service Provider | NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 8/12/09 Docket No. RD09-9-000. |
| FERC Order 754 | FERC Order 754 | Transmission Planner, Planning Coordinator | Developing ans action plan for SPCS and TIS meetings December 6-7. 2011. |
| SPM | Standards Process Manual | | FERC approved revisions 8/25/11 (see Docket No. RR10-12-001). |
| VRF | Violation Risk Factors Criteria and Tool | Transmission Operator, Transmission Owner, Balancing Authority, Generator Owner, Generator Operator, Interchange Authority, Load-Serving Entity, Distribution Provider, Reliability Coordinator, Reliability Entity, Transmission Planner, Resource Planner, Transmission Service Provider, Planning Coordinator, Purchasing-Selling Entity, Reserve Sharing Group | Considering comments from 3/23/10-5/07/10 posting |