Skip to main content
Western Electricity Coordinating Council
Go Search
Skip navigation links
Home
About WECC
Standards
Committees
Planning
Training
Library
Compliance
Careers
Modify settings and columns
NERC Projects
  
View: 
Sort by AttachmentsUse SHIFT+ENTER to open the menu (new window).
Applicability
StatusFilter
Count = 108
2006-01Use SHIFT+ENTER to open the menu (new window).
System Personnel TrainingTransmission Operator; Balancing Authority; Reliability Coordinator
FERC approved 11/18/10 Docket No. RM09-25-000.
 
Yes6/9/2011 3:14 PM
2006-02Use SHIFT+ENTER to open the menu (new window).
Assess Transmission and Future NeedsTransmission Planner; Planning Coordinator
NERC BOT approved. Implementation pending regulatory filing. Filed with FERC 10/19/77. Docket No. RM06-16-000.
No10/20/2011 1:54 PM
2006-03Use SHIFT+ENTER to open the menu (new window).
System Restoration and BlackstartTransmission Operator; Transmission Owner; Generator Operator; Distribution Provider; Reliability Coordinator
FERC approved 3/17/11 Docket No. RM10-16-000.
Yes6/9/2011 2:30 PM
2006-04Use SHIFT+ENTER to open the menu (new window).
Backup FacilitiesTransmission Operator; Balancing Authority; Reliability Coordinator
FERC Approval April 21, 2011 (Docket No. RD11-4-000)
Yes6/8/2011 11:24 AM
2006-06Use SHIFT+ENTER to open the menu (new window).
Reliability CoordinationTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Service Provider; Purchasing-Selling Entity
IRO-002-3, IRO-005-4, IRO-014-02 are NERC BOT approved. Implementation pending regulatory filing and conforming changes to IRO-001-1.1.
 
Development on COM-001-2, COM-002-3, and IRO-001-3 continues. The LSE, PSE, TSP, and Interchange Coordinator were removed from the applicability list for these three standards.
No2/6/2012 11:19 AM
2006-07Use SHIFT+ENTER to open the menu (new window).
Transfer Capabilities: ATC-TTC-CBM-TRM - MOD StandardsTransmission Operator; Balancing Authority; Load-Serving Entity; Transmission Planner; Resource Planner; Transmission Service Provider
FERC Approved November 24, 2009
Docket No. RM08-19-000, et al.; Order No. 729
Yes6/11/2010 11:25 AM
2006-08Use SHIFT+ENTER to open the menu (new window).
Transmission Loading ReliefBalancing Authority; Reliability Coordinator
FERC Approval April 21, 2011 (Docket No. RD11-2-000)
Yes6/8/2011 11:25 AM
2007-01Use SHIFT+ENTER to open the menu (new window).
Underfrequency Load SheddingTransmission Operator; Transmission Owner; Load-Serving Entity; Distribution Provider
NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 3/31/11 Docket No. RM06-16-000.
NOPR issued 10/20/11
No10/20/2011 1:43 PM
2007-02Use SHIFT+ENTER to open the menu (new window).
Operating Personnel Communications ProtocolsTransmission Owner; Generator Operator; Interchange Authority
Considering comments from 11/30/09-1/15/10 Posting
No6/11/2010 11:14 AM
2007-03Use SHIFT+ENTER to open the menu (new window).
Real-time OperationsTransmission Operator; Transmission Owner; Generator Operator; Interchange Authority
Considering comments from 4/26/11-6/9/11 posting and ballot
No6/16/2011 9:36 AM
2007-04Use SHIFT+ENTER to open the menu (new window).
Certifying System OperatorsTransmission Operator; Balancing Authority; Reliability Coordinator
FERC approval 9/15/11 Docket No. RD11-7-000.
No9/22/2011 2:07 PM
2007-05Use SHIFT+ENTER to open the menu (new window).
Balancing Authority ControlsBalancing Authority
Merged with Project 2007-14 into Project 2010-14
Yes10/6/2011 10:10 AM
2007-06Use SHIFT+ENTER to open the menu (new window).
System Protection CoordinationTransmission Operator; Balancing Authority; Generator Operator
Considering comments from 9/11/09-10/26/09 posting
No6/11/2010 11:14 AM
2007-07Use SHIFT+ENTER to open the menu (new window).
Transmission Vegetation ManagementTransmission Operator
Pending Regulatory Filing
No11/7/2011 3:26 PM
2007-09Use SHIFT+ENTER to open the menu (new window).
Generator VerificationGenerator Owner; Generator Operator; Transmission Planner
Considering comments for MOD-026-1 and PRC-024-1 from 7/22/11-8/1/11 ballot.
Considering comments from the 6/15/11-7/15/11 comment period for the MOD-025-2, MOD-027-1, and PRC-019-1 standards.
No9/22/2011 11:28 AM
2007-11Use SHIFT+ENTER to open the menu (new window).
Disturbance MonitoringTransmission Owner; Generator Owner
Considering comments from 2/2/09-3/18/09 posting
No6/11/2010 11:14 AM
2007-12Use SHIFT+ENTER to open the menu (new window).
Frequency ResponseBalancing Authority; Generator Owner; Generator Operator; Load-Serving Entity; Reliability Coordinator
Posted for comment (10/25/11-12/09/11)
Ballot Period (11/30/11-12/09/11)
No12/9/2011 2:19 PM
2007-14Use SHIFT+ENTER to open the menu (new window).
Permanent Changes to CI Timing TableBalancing Authority
FERC Approved December 17, 2009
Docket No. RM09-8-000; Order No. 730
Yes6/11/2010 11:37 AM
2007-17Use SHIFT+ENTER to open the menu (new window).
Protection System Maintenance and TestingTransmission Owner; Generator Owner; Distribution Provider
Considering the comments during the comment and ballot periods ending 9/28/11
The project will proceed to a successive ballot.
Definition filed with FERC 3/30/11 Docket No. RM11-19-000
No10/17/2011 10:33 AM
2007-18Use SHIFT+ENTER to open the menu (new window).
Reliability-Based ControlBalancing Authority; Generator Operator; Load-Serving Entity; Reliability Coordinator; Purchasing-Selling Entity
Merged with Project 2007-05 into Project 2010-14
Standards Under Field Test
No8/31/2011 3:22 PM
2007-23Use SHIFT+ENTER to open the menu (new window).
Violation Severity LevelsTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Planner; Resource Planner; Transmission Service Provider; Planning Coordinator; Purchasing-Selling Entity; Reserve Sharing Group
Compliance Filing March 21, 2011 for RD09-7-003 and RD10-6-001
FERC approved 5/19/11 Dockets RR08-4-005 and RM08-11-001
Yes6/20/2011 11:28 AM
2007-24Use SHIFT+ENTER to open the menu (new window).
Interpretation of TPL-002 and TPL-003 R1.3.12 and R1.3.2 by AmerenTransmission Planner; Planning Coordinator
FERC Approved April 23, 2010
Yes6/22/2010 11:28 AM
2007-26Use SHIFT+ENTER to open the menu (new window).
Interpretation of TPL-002 and TPL-003 R1.3.12 and R1.3.2 by MISOTransmission Planner; Planning Coordinator
FERC Approved April 23, 2010
Yes6/22/2010 11:29 AM
2007-27Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-006 R1.1 by SCE&GTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider

FERC Approved 5-19-11 Docket RD10-8-000.

Yes6/20/2011 11:29 AM
2007-28Use SHIFT+ENTER to open the menu (new window).
Interpretation of VAR-001-1 - Voltage and Reactive Control by DynegyTransmission Operator; Purchasing-Selling Entity
FERC remands interpretation of VAR-001-1 May 21, 2009.
Docket No. RM08-16-000; Order No. 724
Yes6/22/2010 10:41 AM
2008-01Use SHIFT+ENTER to open the menu (new window).
Voltage and Reactive ControlTransmission Owner; Generator Owner; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Planner; Resource Planner; Planning Coordinator; Purchasing-Selling Entity
NERC is drafting a draft standard.
No2/23/2011 11:43 AM
2008-02Use SHIFT+ENTER to open the menu (new window).
Undervoltage Load SheddingTransmission Operator; Transmission Owner; Generator Owner; Generator Operator; Load-Serving Entity; Distribution Provider
Considering comments from SAR Posting (1/20/10-2/19/10)
No1/3/2011 12:04 PM
2008-05Use SHIFT+ENTER to open the menu (new window).
Credible Multiple Element ContingenciesReliability Coordinator
Standards Request withdrawn by Standards Committee.
Yes6/22/2010 11:33 AM
2008-06Use SHIFT+ENTER to open the menu (new window).
Cyber Security - Order 706Reliability Coordinator
Version 4 of the CIP Standards (Phase II) approved by NERC BOT 1/24/11. FERC issued NOPR for CIP V4 standards on 9/15/11 Docket No. RM11-11-000.
FERC Approval of VRFs and VSLs for CIP Versions 2 and 3 January 20, 2011.
Update from Version 1 to Version 2 (Phase I) approved by FERC.  Enforceable April 1, 2010.
FERC approved Version 1 March 18, 2010.
Version 5 of CIP Standards
Initial ballot (12/16/11-1/06/12)
Join ballot pool (11/07/11-12/15/11)
Comment period (11/07/11-01/06/12)
No11/7/2011 3:32 PM
2008-07Use SHIFT+ENTER to open the menu (new window).
Interpretation of EOP-002-2 R6.3 and R7.1 by Brookfield PowerBalancing Authority
Requesting NERC BOT Adoption 
Yes1/31/2011 12:23 PM
2008-08Use SHIFT+ENTER to open the menu (new window).
EOP Violation Severity Levels RevisionsTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator
FERC approved 5/19/11 Docket Nos. RR08-4-005 and RM08-11-001.
Yes6/20/2011 12:36 PM
2008-09Use SHIFT+ENTER to open the menu (new window).
Interpretation of EOP-001-0 R1 by Regional Entity Compliance ManagersTransmission Operator; Balancing Authority
FERC approval 12/15/11 Docket No. RD11-12-000
.
No12/15/2011 10:34 AM
2008-10Use SHIFT+ENTER to open the menu (new window).
Interpretation - CIP-006 - Cyber Security - Physical Security of Cyber Security AssetsTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider

Recirculation ballot (12/09/11-12/19/11)

No12/9/2011 2:23 PM
2008-11Use SHIFT+ENTER to open the menu (new window).
Interpretation of VAR-002a by ICF ConsultingGenerator Owner; Generator Operator
FERC approved 9/16/10 Docket No. RD09-5-000.
Yes6/8/2011 11:23 AM
2008-12Use SHIFT+ENTER to open the menu (new window).
Coordinate Interchange StandardsTransmission Operator; Balancing Authority; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider; Purchasing-Selling Entity
Considering comments from 11/10/09-12/11/09 posting
No6/11/2010 11:14 AM
2008-13Use SHIFT+ENTER to open the menu (new window).
Interpretation of TOP-002-2 R11 by Orlando Utilities CommissionTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Transmission Service Provider
FERC Approved December 2, 2009
Docket No. RD09-6-000
Yes6/11/2010 11:41 AM
2008-14Use SHIFT+ENTER to open the menu (new window).
Cyber Security Violation Severity LevelsTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC approved 5/19/11 Dockets RR08-4-005 and RM08-11-001
Yes6/20/2011 12:37 PM
2008-15Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-006-1a by US Army Corps of EngineersTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC Approved 5-19-11 Docket RD10-8-000.
Yes6/20/2011 12:38 PM
2008-16Use SHIFT+ENTER to open the menu (new window).
Transmission Operations Violation Severity Levels - TOP-004-2Transmission Operator
FERC Approved December 10, 2009
Docket No. RD09-3-000
Yes6/11/2010 11:42 AM
2008-18Use SHIFT+ENTER to open the menu (new window).
Interpretation of TOP-005-1 and IRO-005-1 by Manitoba HydroTransmission Operator; Balancing Authority; Reliability Coordinator; Purchasing-Selling Entity
FERC Approval April 21, 2011 (Docket No. RM10-8-000)
Yes6/8/2011 11:26 AM
2009-01Use SHIFT+ENTER to open the menu (new window).
Disturbance and Sabotage ReportingTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Reliability Coordinator
Posted for comment (10/28/11-12/12/11)
Ballot Period (12/02/11-12/12/11)
No11/30/2011 10:33 AM
2009-02Use SHIFT+ENTER to open the menu (new window).
Real-Time Reliability Monitoring and Analysis CapabilitiesTransmission Operator; Balancing Authority; Generator Operator; Reliability Coordinator
Considering comments received during Concept White Paper posting of 2/16/11-4/4/11 
No4/8/2011 11:26 AM
2009-03Use SHIFT+ENTER to open the menu (new window).
Emergency OperationsTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Service Provider; Purchasing-Selling Entity
Forming Drafting Team
No6/11/2010 11:15 AM
2009-05Use SHIFT+ENTER to open the menu (new window).
Resource Adequacy AssessmentsGenerator Owner; Generator Operator; Load-Serving Entity; Resource Planner; Planning Coordinator
The NERC Standards Coordinator is recommending for inclusion in the NERC Rules of Procedure.
No6/11/2010 11:15 AM
2009-06Use SHIFT+ENTER to open the menu (new window).
Facility RatingsTransmission Owner; Generator Owner
NERC BOT approved. Filed with FERC 6/15/11 Docket No. RM11-28-000.
FERC approval 11/17/11 Docket No. RD11-10-000.
No11/18/2011 9:48 AM
2009-07Use SHIFT+ENTER to open the menu (new window).
Reliability of Protection SystemsTransmission Owner; Generator Owner; Distribution Provider
Developing SAR
No6/11/2010 11:15 AM
2009-08Use SHIFT+ENTER to open the menu (new window).
Nuclear Plant Interface CoordinationTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Planner; Transmission Service Provider; Planning Coordinator
FERC approved 5/19/11 Docket Nos. RR08-4-005 and RM08-11-001.
Yes6/20/2011 12:39 PM
2009-09Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-001-1 R2 by Covanta EnergyTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Reliability Coordinator
FERC Approval February 2, 2011 (Docket No. RD10-11-000)
Yes6/8/2011 11:26 AM
2009-10Use SHIFT+ENTER to open the menu (new window).
Interpretation of PRC-005-1 R1 by Compliance Monitoring Process Working Group (CMPWG)Transmission Owner; Generator Operator; Distribution Provider
NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 11/17/09 Docket No. RM06-16-000.
No9/26/2011 2:28 PM
2009-11Use SHIFT+ENTER to open the menu (new window).
Interpretation of IRO-010-1 R1.2 and R3 by WECC Reliability Coordination SubcommitteeTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator
FERC approved 3/17/11 Docket No. RM10-15-000.
Yes6/9/2011 2:30 PM
2009-12Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-005-1 R4.2.2 and R1.3 by PacifiCorpTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Load-Serving Entity
FERC Approval February 2, 2011 (Docket No. RD10-12-000)
Yes6/8/2011 11:28 AM
2009-13Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-006-1 R1.1 by PacifiCorpTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC approved 5/19/11 Docket No. RD10-8-000.
Yes6/20/2011 12:41 PM
2009-14Use SHIFT+ENTER to open the menu (new window).
Interpretation of TPL-002-0 R1.3.10 by PacifiCorpTransmission Planner; Planning Coordinator
FERC approved 9/15/11 Docket No. RM10-6-000; Order No. 754
Yes10/6/2011 10:14 AM
2009-15Use SHIFT+ENTER to open the menu (new window).
Interpretation of MOD-001-1 R2 and R8 and MOD-029-1 R5 and R6 by NYISOTransmission Operator; Transmission Service Provider
FERC approved 9/16/10 Docket No. RD10-5-000.
Yes6/9/2011 2:29 PM
2009-16Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-007-1 R2 by WECCTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC Approved March 18, 2010.
Docket No. RD10-3-000
Yes6/11/2010 11:42 AM
2009-17Use SHIFT+ENTER to open the menu (new window).
Interpretation of PRC-004-1 and PRC-005-1 R2 by Y-W Electric and Tri-State G & TTransmission Owner; Generator Owner; Distribution Provider
NERC BOT approved. Implementation pending regulatory approval. FERC approved 9/26/11 Docket No. RM11-5-000.
Yes10/6/2011 10:15 AM
2009-18Use SHIFT+ENTER to open the menu (new window).
Withdraw Three Midwest ISO WaiversBalancing Authority
FERC approved 5/16/11 Docket No. RD10-4-000.
Yes6/20/2011 12:42 PM
2009-19Use SHIFT+ENTER to open the menu (new window).
Interpretation of BAL-002-0 R4 and R5 by NWPP Reserve Sharing GroupBalancing Authority; Reserve Sharing Group
Standards Committee curtailed work 04/12/11
Yes7/18/2011 3:45 PM
2009-20Use SHIFT+ENTER to open the menu (new window).
Interpretation of BAL-003-0 R4 and R5 by Energy Mark, Inc.Balancing Authority
Requesting NERC BOT approval.
No7/21/2010 10:17 AM
2009-21Use SHIFT+ENTER to open the menu (new window).
Cyber Security Ninety-Day ResponseTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC approved 5/19/11 Dockets RR08-4-005 and RM08-11-001,
Yes6/20/2011 12:43 PM
2009-22Use SHIFT+ENTER to open the menu (new window).
Interpretation of COM-002-0 R2 by the ISO/RTO CouncilTransmission Operator; Balancing Authority; Generator Operator; Reliability Coordinator
Considering comments from November ballot.
No11/30/2011 10:46 AM
2009-23Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-004-2 R3 by Army Corps of EngineersTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
Standards Committee curtailed work 04/12/11.
Yes8/4/2011 11:17 AM
2009-24Use SHIFT+ENTER to open the menu (new window).
Interpretation of EOP-005-1 R7 by FMPATransmission Operator; Balancing Authority
Balloting Deferred per NERC Standards Committee.
No6/11/2010 11:15 AM
2009-25Use SHIFT+ENTER to open the menu (new window).
Interpretation of BAL-001-01 and BAL-002-0 by BPABalancing Authority; Reserve Sharing Group
Standards Committee curtailed work 04/12/11.
Yes8/4/2011 11:19 AM
2009-26Use SHIFT+ENTER to open the menu (new window).
Interpretation of CIP-004-1 by WECCTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Reliability Entity; Transmission Service Provider
Placed on hold
No4/1/2011 2:04 PM
2009-27Use SHIFT+ENTER to open the menu (new window).
Interpretation of TOP-002-2a R10 by FMPPTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Transmission Service Provider
FERC approved 10/20/11 Docket No. RD11-9-000.
No10/20/2011 10:04 AM
2009-28Use SHIFT+ENTER to open the menu (new window).
Interpretation of EOP-001-1 and EOP-001-2 R2.2 by FMPPTransmission Operator; Balancing Authority
NERC BOT approved.
FERC filing 9/9/11; Docket No. RM11-32-000
.
No10/6/2011 9:52 AM
2009-29Use SHIFT+ENTER to open the menu (new window).
Interpretation of TOP-002-2a R6 by FMPPTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Transmission Service Provider
Standards Committee curtailed work 04/12/11
Yes8/4/2011 11:25 AM
2009-30Use SHIFT+ENTER to open the menu (new window).
Interpretation of PRC-001-1 R1 by WPSCTransmission Operator; Balancing Authority; Generator Operator
Standards Committee curtailed work 04/12/11
Yes8/4/2011 11:25 AM
2009-31Use SHIFT+ENTER to open the menu (new window).
Interpretation of TOP-001-1 R8 by FMPPTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Distribution Provider
FERC approval 9/15/11 Docket No. RM10-29-000.
Yes10/6/2011 10:16 AM
2009-32Use SHIFT+ENTER to open the menu (new window).
Interpretation of EOP-003-1 R3 and R5 by FMPPTransmission Operator; Balancing Authority
Standards Committee curtailed work 04/12/11
 
Yes8/4/2011 11:26 AM
2010-04Use SHIFT+ENTER to open the menu (new window).
Interpretation − EOP-001-1 by FMPPTransmission Operator; Balancing Authority
Standards Committee curtailed work 04/12/11
Yes8/4/2011 11:29 AM
2010-05.1Use SHIFT+ENTER to open the menu (new window).
Project 2010-05.1 Protection Systems:  Phase 1 (Misoperations)Transmission Owner; Generator Owner; Distribution Provider
Considering comments for SAR and draft standard  from 6/10/11-7/11/11 posting.
No8/4/2011 1:22 PM
2010-06Use SHIFT+ENTER to open the menu (new window).
Results-based Reliability StandardsTransmission Owner; Planning Coordinator
Posted Proposal for Development
Yes10/17/2011 11:55 AM
2010-07Use SHIFT+ENTER to open the menu (new window).
Transmission Requirements at the Generator InterfaceTransmission Operator; Transmission Owner; Generator Owner; Generator Operator
Considering comments form 11/9/11-11/18/11 ballot
No11/30/2011 10:51 AM
2010-08Use SHIFT+ENTER to open the menu (new window).
Functional Model Glossary RevisionsTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Planner; Resource Planner; Transmission Service Provider; Planning Coordinator; Purchasing-Selling Entity
Considering SAR comments
No6/11/2010 11:15 AM
2010-09Use SHIFT+ENTER to open the menu (new window).
Cyber Security Order 706B - Nuclear Plant Implementation PlanTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Reliability Entity; Transmission Service Provider
FERC approved 3/31/11 Docket No. RD09-7-002.
Yes6/9/2011 2:31 PM
2010-10Use SHIFT+ENTER to open the menu (new window).
FAC Order 729Reliability Coordinator; Planning Coordinator
NERC Board Approved 1/24/11
Filed with FERC 1/28/11 Docket No. RM08-19-000
FERC approval 11/17/11 Docket No. RD11-3-000
Yes12/9/2011 2:38 PM
2010-11Use SHIFT+ENTER to open the menu (new window).
TPL Table 1 OrderTransmission Planner; Planning Coordinator
NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 3/31/11 Docket No. RM06-16-009.
NOPR issued 10/20/11.
No11/18/2011 9:21 AM
2010-12Use SHIFT+ENTER to open the menu (new window).
Order 693 DirectivesTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Reliability Entity; Transmission Planner; Resource Planner; Planning Coordinator; Purchasing-Selling Entity; Reserve Sharing Group
FERC approved 1/10/11 Docket No. RD10-15-000.
Yes6/9/2011 2:31 PM
2010-13.1Use SHIFT+ENTER to open the menu (new window).
Transmission Relay Loadability (Phase 1)Transmission Owner; Generator Owner; Distribution Provider; Reliability Coordinator; Planning Coordinator
FERC approved Compliance Filing May 16, 2011 (Docket RD10-10-000)
PRC-023-2 Filed with FERC on March 18, 2011.
FERC NOPR issued 9/15/11 (Docket No. RM11-16-000)
No9/22/2011 12:45 PM
2010-13.2Use SHIFT+ENTER to open the menu (new window).
Phase 2 of Relay Loadability: GenerationTransmission Owner; Generator Owner; Distribution Provider; Planning Coordinator
Project in Informal Development
No8/31/2011 1:19 PM
2010-14.1Use SHIFT+ENTER to open the menu (new window).
Balancing Authority Reliability-based Control: Reserves (Phase 1)Balancing Authority
First draft is scheduled for December 2011.
No9/22/2011 12:27 PM
2010-14.2Use SHIFT+ENTER to open the menu (new window).
Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and InadvertentBalancing Authority
Coming Soon
No8/31/2011 1:31 PM
2010-15Use SHIFT+ENTER to open the menu (new window).
Urgent Action Revisions to CIP-005-3 Transmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Reliability Entity; Transmission Service Provider
Unable to achieve consensus; transferred to CIPv5.
Yes8/31/2011 3:16 PM
2010-16Use SHIFT+ENTER to open the menu (new window).
2010-13Generator Operator
Considering comments submitted about the SAR that was posted from 11/3/10-12/3/10
 
No12/8/2010 11:18 AM
2010-17Use SHIFT+ENTER to open the menu (new window).
Definition of Bulk Electric SystemTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Reliability Entity; Transmission Planner; Resource Planner; Transmission Service Provider; Planning Coordinator; Purchasing-Selling Entity; Reserve Sharing Group

BES Exception Process: considering comments from 9/13/11-10/27/11 posting

BES definition is waiting for NERC Board adoption.

No11/30/2011 10:38 AM
2010-INT-01Use SHIFT+ENTER to open the menu (new window).
Interpretation − TOP-006-2 by FMPPTransmission Operator; Balancing Authority; Generator Operator; Reliability Coordinator
Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee.
No8/31/2011 2:30 PM
2010-INT-02Use SHIFT+ENTER to open the menu (new window).
Interpretation − TOP-003-1 by FMPPTransmission Operator; Balancing Authority; Generator Operator; Reliability Coordinator
Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee.
No8/31/2011 2:30 PM
2010-INT-03Use SHIFT+ENTER to open the menu (new window).
Interpretation − TOP-002-2a by FMPPTransmission Operator; Balancing Authority; Generator Operator; Load-Serving Entity; Transmission Service Provider
Pre-ballot review closed (3/5/10-4/5/10)
Balloting Deferred per Standards Committee.
No8/31/2011 2:31 PM
2010-INT-05Use SHIFT+ENTER to open the menu (new window).
CIP-002-1 Requirement R3 for Duke EnergyTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Reliability Entity; Transmission Service Provider
Approved CIP-002-2. This interpretation is still under development.
No8/31/2011 2:32 PM
2011-INT-01Use SHIFT+ENTER to open the menu (new window).
Interpretation of MOD-028-1 for FPLTransmission Operator; Transmission Service Provider
Considering comments form11/7/11-11/16/11 ballot
No11/30/2011 11:22 AM
2011-INT-02Use SHIFT+ENTER to open the menu (new window).
Interpretation of VAR-002 for ConstellationGenerator Owner; Generator Operator
No3/23/2012 4:08 PM
2012-2014Use SHIFT+ENTER to open the menu (new window).
Reliability Standards Development PlanTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Distribution Provider; Reliability Coordinator; Transmission Planner; Resource Planner; Transmission Service Provider; Planning Coordinator; Purchasing-Selling Entity; Reserve Sharing Group

Approval of the North American Electric Reliability Corporation’s Reliability Standards Development Plan 2012-2014 is pending regulatory filing.

 

No11/30/2011 11:28 AM
BAL-004-1Use SHIFT+ENTER to open the menu (new window).
Urgent Action SAR for Revision - BAL-004-1Balancing Authority; Reliability Coordinator
FERC remanded March 18, 2010
Docket No. RM09-16-000
No6/16/2011 10:43 AM
CSO706BUse SHIFT+ENTER to open the menu (new window).
Cyber Security Order 706B - Nuclear Plant Implementation PlanTransmission Operator; Transmission Owner; Balancing Authority; Generator Owner; Generator Operator; Interchange Authority; Load-Serving Entity; Reliability Coordinator; Transmission Service Provider
FERC approved standard March 18, 2010 in FERC Order RM06-22-011.
Yes6/22/2010 1:55 PM
ERCOTUse SHIFT+ENTER to open the menu (new window).
ERCOT Request for Interpretation - BAL-003-0, Requirements 2, 2.2, 5, and 5.1Balancing Authority
FERC Approved May 21, 2009
Docket No. RM08-16-000; Order No. 724
Yes6/11/2010 11:42 AM
ErrataUse SHIFT+ENTER to open the menu (new window).
Errata -Various Standards ErrataTransmission Operator; Balancing Authority; Load-Serving Entity; Reliability Coordinator; Transmission Planner; Resource Planner; Transmission Service Provider
NERC BOT approved. Implementation pending regulatory approval. Filed with FERC 8/12/09 Docket No. RD09-9-000.
No6/16/2011 11:08 AM
FERC Order 754Use SHIFT+ENTER to open the menu (new window).
FERC Order 754Transmission Planner; Planning Coordinator
Developing ans action plan for SPCS and TIS meetings December 6-7. 2011.
No11/18/2011 8:57 AM
FMDRATUse SHIFT+ENTER to open the menu (new window).
Functional Model Demand Response Advisory Team
Advisory team formed.
Yes6/22/2010 2:02 PM